In the DUKE (Durchlaufkonzept – Entwicklung und Erprobung [Cycle Concept – Development and Testing]) test system, the steam needed to generate electricity is produced directly in the receiver tubes of the parabolic troughs. Intermediate steps employing a heat transfer medium are no longer needed and higher operating temperatures are possible.